Push Changes Its Design Mode and Improves Design Efficiency Using PTC’s Pro/ENGINEER Wildfire

“Parametric design provided by Pro/ENGINEER has enabled a more flexible product design, and we can change the parameters in a faster manner in order to have multiple design methods. ‘A craftsman must sharpen their tools first to do their job well’, Pro/ENGINEER has helped us reduce design time and improved our design efficiency.” Zheng Jiakun (Master), Director of Composition Department, Sichuan Yibin Push Heavy Machinery Co., Ltd.

Source: www.PTC.com